Search:

Final Touches

Main mast stepped again, with bowsprit installed, to start the rigging installation.

main mast fitting full size

Mizzen and main boom installed, measuring for line length.

mast's fitted full size

Testing jibstay attachment point, and side stay attachment points.

jib and side stay attachment full size

One of the last pieces that need to be made, is the centerboard trunk cover. Here it is dry fitted into place.

centerboard trunk cover full size

The name goes on!! Centerboard trunk is now varnished. Hatches in front of boat installed, and fittings for mizzen downhaul, and roller furling line.

port side name full size

Name on other side.

starboard side name full size

Converting temporary cover trusses to spar trailering supports. Still works as a cover tent too.

spar carrier fitting full size

Boat lifted off trailer, for trailer work. Need to make some of the rollers wider to fit the keel. Also weighed the boat, 458lbs or 208kgs

boat on forklift full size

Nathaniel welding in new roller brackets.

new roller brackets full size

All fitting is done, boat is ready to go!!!

main mast fitting full size

Prev