Navigator Dinghy build progress part 28
Final Touches
Main mast stepped again, with bowsprit installed, to start the rigging installation.
Mizzen and main boom installed, measuring for line length.
Testing jibstay attachment point, and side stay attachment points.
One of the last pieces that need to be made, is the centerboard trunk cover. Here it is dry fitted into place.
The name goes on!! Centerboard trunk is now varnished. Hatches in front of boat installed, and fittings for mizzen downhaul, and roller furling line.
Name on other side.
Converting temporary cover trusses to spar trailering supports. Still works as a cover tent too.
Boat lifted off trailer, for trailer work. Need to make some of the rollers wider to fit the keel. Also weighed the boat, 458lbs or 208kgs
Nathaniel welding in new roller brackets.
All fitting is done, boat is ready to go!!!