Search:
Alignment and final drilling
9.0 Hours

Forward plumb bob full size
I created plumb bobs from sockets and fishing line. This allows me to make sure the assembly is vertical from front to back before drilling the j-stiffeners

Another plumb bob full size
The next one back

Line it up with the centerline full size
Making sure it is correct.

The final plumb bob full size
This one is at the end of the tailcone.

Final drilling j-stiffeners full size
Now that everything is lined up, drill the stiffeners and cleco. After this the assembly is much more rigid.