Search:
After Bulkhead parts
5.0 Hours

F-711C full size
Laid out and cut F-711C Stab attach bars

F-710B full size
Laid out and cut F-710B angle for F-710 bulkhead Drilled the angle to the bulkhead. Deburred holes.

F-711 bulkhead full size
Cleco'd F-711A to F-711B, then drilled the F-711C attach bars to the assembled bulkhead.

F-712E full size
Laid out, cut F-712E. Tapped the hole for the tie down anchor.