Navigator Dinghy build progress part 6
June 2020
Installing the transom and longitudinals.
The main mast step fitted.
Putting fillets on the longitudinals.
Prepping for mast doubler.
Mast doubler glued in place.
Installing first stringer at bow.
Installing the second stringer.
One of the stringers had a knot, installed a graving piece to remove it.
Putting on wet cloths to get the stringers to form into the sharp curve at the bow.
Some more cloths at the stern, there was a lot of twist in the stringers there.
Fitting the third stringer into place.