Search:

June 2020

Installing the transom and longitudinals.

Transom full size

The main mast step fitted.

Mainmast step full size

Putting fillets on the longitudinals.

filleting longitudinals full size

Prepping for mast doubler.

mast doubler full size

Mast doubler glued in place.

mast doubler glued in full size

Installing first stringer at bow.

Fitting first stringer full size

Installing the second stringer.

Fitting second stringer full size

One of the stringers had a knot, installed a graving piece to remove it.

graving piece in stringer full size

Putting on wet cloths to get the stringers to form into the sharp curve at the bow.

wetting stringers at bow full size

Some more cloths at the stern, there was a lot of twist in the stringers there.

wetting stringers at stern full size

Fitting the third stringer into place.

third stringer being fitted full size

Next Prev