Search:
Main Gear Weldments
5.0 Hours
Installing nutplates full size
Install nutplates on flap motor housing.
F-785A full size
Cleaned and painted F-785A, installed it.
Reaming main landing gear bolt full size
The landing gear leg is put into the weldment, and then the hole is reamed. Here it is clamped on the bench.
The hole full size
The hole after it has been reamed.
Bolting in left weldment full size
There are a lot of bolts that go through this.
Bolting right weldment full size
A lot of bolts.