Search:
Assembling leading edge
4.0 Hours
Assembling Leading edge full size
Putting ribs into the leading edge skin. This is just as hard as it was on the left side.
Installing leading edge onto spar full size
Put leading edge assembly onto the spar. Cleco'd into place. Drilled holes common to ribs and spar.
Installing leading edge full size
Another view of leading edge on the spar
Leading edge splice plat full size
Cut and fit leading edge splice plate, installed on leading edge.