Search:

7.0 Hours

empennage box 2

empennage box 2 full size

The second box came today. This one contained the skins and the spars and some other pieces. A lot less stuff than the other box

Skins unpacked from the box

Skins unpacked from the box full size

This is the skins that were in the box, sitting out

Empennage spars

Empennage spars full size

The spars.

Horizontal stabilizer ribs

Horizontal stabilizer ribs full size

I am getting ready to deburr and flute the horizontal stab ribs.

ribs and spars

ribs and spars full size

The ribs are almost all deburred and fluted. I didn't take a picture while I was assembling the forward and rear spars. They are sitting on the table. They have been match drilled with the splice doublers, attach angles, and some of the hinge fittings.

Prev Next