4 October 2008
Assembling Left Elevator
7.0 hours
![]() |
Cleco'd spars, ribs, and skin (Full size) The spar, trim tab spar, inner rib are cleco'd to the skin and match drilled to the skin. |
![]() |
Assembling counterbalance (Full size) The two outer ribs are made flat, and cleco'd together. Then the counterbalance skin is cleco'd to the ribs. Then all holes are match drilled |
![]() |
Attaching counterbalance assembly (Full size) The counterbalance assembly is attached to the skin, spar assembly |
![]() |
Another view of elevator assembly (Full size) After the counterbalance assembly is attached, all holes are match drilled in these parts |
![]() |
Dimpling, deburring elevator parts (Full size) The whole thing comes back apart and the deburring, dimpling, de-scratching process is started. These are all the parts that were assembled in the last stage |
Next | Prev