6 September 2008
Skin and stiffener work

3.0 hours

Match drilling skin and stiffeners
Match drilling skin and stiffeners (Full size)

After cutting out, filing, and deburring the stiffeners, started match drilling them to the skin.

Dimpled stiffeners
Dimpled stiffeners (Full size)

Deburred the holes, then dimpled the stiffeners. Also scotch-brited all the stiffeners also

After shaping and smoothing the stiffeners, cleco'd them
After shaping and smoothing the stiffeners, cleco'd them (Full size)

to the skin, and match drilled the skin and stiffeners

Dimpled stiffeners and trim panel doubler
Dimpled stiffeners and trim panel doubler (Full size)

Once the stiffeners were match drilled, deburred and dimpled them. I also did the same to the trim panel doubler, plus dimpled the #6 screw holes


Next   |   Prev