28 July 2011
Finish drilling MLG mounts
0.5 hours
![]() |
Nutplates for Flap bearing block (Full size) Put in the nutplates for the flap bearing block. |
![]() |
Last 2 bolt holes for MLG weldments (Full size) There are 2 more holes to drill for the MLG. These are countersunk on the outside to clear wing leading edge. Here the bolt holes have been countersunk. |
![]() |
Drilling right side bolt holes (Full size) Just after drilling before countersinking. |
![]() |
Bolting right side (Full size) Put in the bolts on the right side weldment. |
![]() |
All bolts in (Full size) View of the fuselage outside after bolt installation. |
Next | Prev