26 July 2011
Drilling Main Landing Gear Weldment

2.5 hours

Getting ready to drill holes
Getting ready to drill holes (Full size)

There are 5 holes through the weldment and fuselage side.

Holes drilled
Holes drilled (Full size)

The 5 holes drilled through on the left side.

Bolts installed
Bolts installed (Full size)

Bolts in and torqued on the right side.


Next   |   Prev