2 July 2011
F-741 Cover

4.5 hours

Seats in place
Seats in place (Full size)

Here is the fuselage in it's current stage. The seat backs are in temporarily.

Fabbed F-741A-L/R
Fabbed F-741A-L/R (Full size)

Cut these parts from Z shapes.

Drilling F-741A
Drilling F-741A (Full size)

These parts are located over the tunnel and drilled.

Drilling F-741B
Drilling F-741B (Full size)

Fabbed the cover, and drilled in place.

Countersinking holes
Countersinking holes (Full size)

Countersinking holes in F-741A parts.


Next   |   Prev