29 June 2011
Baggage Bulkhead

2.0 hours

Drilling Baggage Bulkhead to frame
Drilling Baggage Bulkhead to frame (Full size)

Drilled F-751 & F-652 bulkheads to F-706 bulkhead.

Fabbed bulkhead wear blocks
Fabbed bulkhead wear blocks (Full size)

Fabbed F-6114C cover wear blocks

Installed wear blocks
Installed wear blocks (Full size)

Wear blocks riveted to baggage bulkhead


Next   |   Prev