3 April 2011
Drilling aft deck
1.0 hours
![]() |
Clamping the F-714 aft deck (Full size) Got the deck clamped in place, made sure everything is still level so no twist in the fuselage. |
![]() |
Drilling aft deck (Full size) Drilled and cleco'd all the holes to full size. |
Next | Prev