3 April 2011
Drilling aft deck

1.0 hours

Clamping the F-714 aft deck
Clamping the F-714 aft deck (Full size)

Got the deck clamped in place, made sure everything is still level so no twist in the fuselage.

Drilling aft deck
Drilling aft deck (Full size)

Drilled and cleco'd all the holes to full size.


Next   |   Prev