9 October 2010
Riveting webs and starting rudder pedals

4.0 hours

Priming landing gear web parts
Priming landing gear web parts (Full size)

The webs, angles and shims cleaned and primed

Drilling F-904-L's
Drilling F-904-L's (Full size)

Placed and drilled F-904-L's in place

The 904-L in place
The 904-L in place (Full size)

Another shot of the the attach clips in place

Landing gear web riveted
Landing gear web riveted (Full size)

Riveted the F-9101, F-996-B/C together

Drilled holes in F-6115 and F-6116 bearing blocks
Drilled holes in F-6115 and F-6116 bearing blocks (Full size)

None

Clamped rudder pedals in place
Clamped rudder pedals in place (Full size)

Put the assembly in place, ready to drill attachment holes


Next   |   Prev