8 August 2010
Alignment and final drilling
9.0 hours
![]() |
Forward plumb bob (Full size) I created plumb bobs from sockets and fishing line. This allows me to make sure the assembly is vertical from front to back before drilling the j-stiffeners |
![]() |
Another plumb bob (Full size) The next one back |
![]() |
Line it up with the centerline (Full size) Making sure it is correct. |
![]() |
The final plumb bob (Full size) This one is at the end of the tailcone. |
![]() |
Final drilling j-stiffeners (Full size) Now that everything is lined up, drill the stiffeners and cleco. After this the assembly is much more rigid. |
Next | Prev