11 May 2010
Riveting left flap skeleton

2.0 hours

Inside nose rib assembly riveted to spar
Inside nose rib assembly riveted to spar (Full size)

Riveted Rib assembly to spar. Riveted Fl-906B and FL-906A to assembly.

Cleco'd FL-905 ribs to spar assembly
Cleco'd FL-905 ribs to spar assembly (Full size)

Cleco the ribs to the spar, and started riveting them. Can be done with the squeezer.

Inner rib
Inner rib (Full size)

Riveted the inner rib and the angle in place.


Next   |   Prev