26 November 2009
Riveting ribs to spars

8.0 hours

Riveting ribs to spars
Riveting ribs to spars (Full size)

After cleaning and priming. Riveted the ribs to the spars

Wing in jig
Wing in jig (Full size)

Placed wing in jig and leveled

Installing upper skin
Installing upper skin (Full size)

Cleco'd upper skin onto skeleton

Drilling j-stiffeners
Drilling j-stiffeners (Full size)

After drilling upper skin, installed and drilled j-stiffeners

Drilling bottom skin
Drilling bottom skin (Full size)

installed and drilled bottom skin to skeleton


Next   |   Prev