![]() |
Priming rear spar parts(Full size) I didn't take pictures of the inboard parts drilling. They can be seen in later pictures during the riveting. Here all the parts have been cleaned, and primed |
![]() |
Inboard end of rear spar(Full size) Cleco'd the W-907C, W-907B doublers to the W-907A spar |
![]() |
Rivets installed in spar(Full size) Here is the finished rivets. Took quite a while to make sure I didn't have rivets installed where they shouldn't be (yet). |
![]() |
W-907D riveted(Full size) Not many rivets go in this one now |
![]() |
W-907E riveted(Full size) Here are the rivets in the W-907E doubler. I dimpled both the doubler and the spar for the outboard rivet holes. Since they are .040 thick dimpling is ok. |